Complete: October 2003
Description: 600 M³ / day automatic backwash fully stainless steel 304 multimedia filter for filtering the incoming JBA water supply line.
Complete: September 2004
Description: 80M M³ / hr automatic backwash multimedia filter for filtering JBA water before concrete suction tank at basement of Le Meridien Hotel.
Complete: February 2005
Description: 2M3/Hr Automatic backwash multimedia filter and granular activated carbon filter.
Complete: March 2004
Description: 7.5M3/Hr & 40M3/Hr manual backwash multimedia filter.
Complete: November 2005
Description: 31M³ / hr manual backwash multimedia filter as side stream filter.
Complete: 2007
Description: 24M3/Hr Automatic Backwash Side Stream Filtration System @ Shah Alam
Complete: 2008
Description: 32.5M3/Hr Automatic backwash side stream filtration system @ Pulau Pinang.
Complete: July 2002
Description: 6000 IGPH Tubewell water treatment plant at IOI Putrajaya Marriott Hotel.
Complete: September 2004
Description: 10M3/Hr Tubewell and tubewell water treatment plant.
Complete: October 2004
Description: 1500 IGPH Tubewell water treatment plant and hot dipped galvanised pressed steel water tank.
Complete: March 2005
Description: 2000 IGPH Tubewell water treatment plant at pusat biodiversity, Raub, Pahang.
Complete: May 2006
Description: 50M³ / Hr tubewell and tubewell water treatment plant at seksyen 26, Shah Alam.
Complete: July 2006
Description: 7M3/Hr automatic mixed bed deionizer water treatment system and 12M3hr tube-well water treatment plant, Kulim, Kedah.
Complete: January 2008
Description: 10 M³ / hr tubewell water treatment plant at Bandar Baru Bangi
Complete: June 2010
Description: 8M3/Hr Tubewell and tubewell water treatment plant at Pasar Borong Seri Kembangan.
Complete: April 2005
Description: 15M3/Hr Automatic regeneration di water treatment plant at Rawang.
Complete: October 2002
Description: 3000 IGPH Pond water filtration system at tangkak, Johor.
Complete: December 2002
Description: 1000Litre/Hr portable mixed bed demoralization system.
Complete: November 2002
Description: 12M3/Hr manual water softener for treating tubewell water after dyna sand filter before the concrete reservoir.
Complete: August 2006
Description: 120M3/Hr Azud helix auto side stream filtration for cooling tower system.
Complete: March 2006
Description: 3000 LPD waste water treatment plant system by vacuum evaporator at Bangsar.
Complete: December 2006
Description: Waste water & water recycling consist of Ion Exchange Recycling System & Vacuum Evaporator
Complete: October 2006
Description: 30M3/Day waste water treatment plant at Paya Mengkuang, Melaka.
Complete: 2006
Description: Upgrading of 30M3/Hr waste water treatment plant(Heavy metal acid/alkaline waste & emulsion waste)
Complete: 2006
Description: Dye-penetrate waste water treatment plant for aeroplane parts.
Complete: March 2007
Description: 6.5M3/Hr waste water treatment & water recycling for ED plant waste.
Complete: March 2007
Description: Upgrading of existing waste water treatment plant.
Complete: January 2008
Description: Upgrading of existing waste water treatment plant at Telok Panglima Garang
Complete: October 2008
Description: Upgrading of Cast Leaf Waste Water Treatment Plant
Complete: January 2009
Description: 12,000 LPD water treatment plant system by vacuum evaporator.
Complete: February 2009
Description: 6M3/Hr waste water treatment plant with anaerobic UASB system at Bio-diesel & Refinery Plant, West Port.
Complete: 2013
Description: ~ 15M3/Hr waste water treatment plant project(With fluoride removal filter)
Complete: 2013
Description: ~ 15M3/Hr waste water treatment plant project(With fluoride removal filter)
Complete: 2011 & 2014
Description: ~ 60 USGPM automatic mixed bed deioniser water treatment plant.
Complete: March 2011
Description: 4M3/Hr wet sanding line RO water treatment plant
Complete: June 2007
Description: Back grind waste recycling system by using ultra filtration system.
Complete: July 2009
Description: Ultra-filtration water treatment plant for Arab Saudi.
Complete: August 2010
Description: UF Backwash water treatment system for existing ultra-filtration system.
Complete: January 2011
Description: Back grind wastewater treatment system by using ultra-filtration system.